Once the installation is complete, a link to Visual Backlog will be added to the project side navigation. The link opens Visual Backlog in the context of the containing project.
Using the mouse:
Click on the background pane and drag to pan
Scroll to pan up and down
Scroll
+ Shift
to pan left and right
Scroll
+ Alt/Option
to pan up and down
Using the trackpad:
Click on the background pane and drag to pan
Use your two fingers to pan
Click and hold on and issue/project node then drag it to move it around.
Using the mouse:
Hold down Control
and scroll up
/ down
t zoom in/ out
Using the trackpad:
Hold down Control
and scroll up
/ down
using you too fingers
Using the on-screen Zoom Controls.
Use the Jira Data Filters on the top of the viewport to load less/more data.
The Reload Button can be used to reload the latest graph data from Jira.
Use the Search Bar to locate issue/project nodes on the graph.
Use the Layout Controls on the left of the Search Bar to customise the graph’s:
Save the Data Filters and Layout Configuration using the Save / Reset buttons
on the top right corner of the viewport.
Visual Backlog draws the issue graph in layers of issues sorted by priority from the highest to the lowest.
Set the Layout Direction to Horizontal using the Layout Direction Button
Filter out issues without epics (issues without epics are always drawn on the first layer anyway)
Prioritise! assign priority to your issues or schedule them for un upcoming sprint. Issues will be grouped into columns ordered from the left to the right by descending priority.
double click an issue to open issue modal
edit the relevant fields e.g. sprint, priority
close the modal (Visual Backlog picks up the changes on modal closing)
Set the Layout Direction to Vertical using the Layout Direction Button
Filter out issues without epics (issues without epics are always drawn on the first layer anyway)
Prioritise! assign priority to your issues or schedule them for un upcoming sprint. Issues will be grouped into rows ordered from the top to the bottom by descending priority.
double click an issue to open issue modal
edit the relevant fields e.g. sprint, priority
close the modal (Visual Backlog picks up the changes on modal closing)